Atlanta, TX Advantages

Permitting

Planning and Building

The City of Atlanta is here to assist developers and business-owners in meeting their expansion needs. The Planning Process, including required public hearings, could involve Annexation, Zoning, Subdivision, and Site Planning. This Process will at most take 120 days. After this review is complete, a commercial or industrial Building Permit will be issued immediately. For more information: Atlanta Planning, Building and Zoning Department - 903-796-2192

Business Certificate of Occupancy

The City of Atlanta requires a one-time Certificate of Occupancy permit for businesses. The fee is $15.00. For more information: Atlanta Planning, Building and Zoning Department - 903-796-2192

Sign Review

The City of Atlanta is committed to a signage policy that serves business while protecting the natural beauty of our community. Businesses must confirm that permanent signage meets ordinance standards. For more information: Atlanta Plannng, Building and Zoning Department - 903-796-2192

Inspection Requirements

For Inspections and more information, contact: 903-796-2192

  • Electrical: T-Pole, Underground, Rough-In, Ceiling Cover (Commercial Buildings), and Final
  • Building: Piers, Foundation, Frame, Final
  • Mechanical: Underground, Rough-In, Final
  • Plumbing: Gas Test, Water Heater (change out), Rough-In, Top Out, Final
  • Fire Protection: Rough-In, Final

Fee Schedule

  • Building Permit Fees:

    It shall be the duty of any builder or contractor or owner to pay, and the duty of the city secretary to collect fees for the issuance of building permits in the following amounts:

    • $100.00 or less. No fee unless inspection required, in which case a $5.00 fee for each inspection shall be charged.
    • $101.00 to $2000.00 - $5.00 per thousand or fraction thereof.
    • $2001.00 to $15,000.00 - $10.00 for the first $2001.00 plus $3.00 for each additional thousand or fraction thereof, to and including $50,000.00.
    • $15,0001.00 to $50,000.00 - $49.00 for the first $15,000.00 plus $2.50 for each additional thousand or fraction thereof, to and including $50,000.00
    • $50,001.00 to $100,000.00 - $136.50 for the first $50,000.00 plus $2.00 for each additional thousand or fraction thereof, to and including $100,000.00.
    • $100,001.00 to $500,000.00 - $236.50 for the first $100,000.00 plus $1.25 for each additional thousand or fraction thereof, to and including $500,000.00
    • $500,001.00 and up - $736.50 for the first $500,000.00 plus $.75 for each additional thousand or fraction thereof.

     

  • Fee for moving of Building or Structures:

    For the moving of any building or structure, the fee shall be $50.00.

  • Plumbing Permit Fees:

    Plumbing Permit Fees

    Description

    Fee

    Issue Fee

    $10.00

    Plumbing Fixtures Each Unit

    $ 2.50

    Floor Drain

    $ 2.50

    Trap including Water and Drainage

    $ 2.50

    House Sewer

    $ 5.00

    House Sewer replaced or repaired

    $ 5.00

    Water Heater (new or change out)

    $ 2.50

    Alteration or repair of water piping

    $ 5.00

    Gas Test (new or repair)

    $10.00

    Backflow devices

    $10.00

    Sprinkler System

    $10.00

    All other (miscellaneous)

    $10.00

  • Electrical Permit Fees:

    Electrical Permit Fees

    Description

    Fee

    Issue Fee

    $10.00

    2 Bedroom Residence New

    $22.00

    3 Bedroom Residence New

    $26.00

    4 Bedroom Residence New

    $30.00

    Multi Family

    $40.00

    First 100 Outlets

    20 cents each

    Greater than 100 Outlets

    5 cents each

    Temporary Pole

    $ 5.00

    Sign Connection

    $ 5.00

    Swimming Pool

    $15.00

    Appliances Each

    $ 2.00

    Circuits 220 Volt

    $ 3.00

    Misc. Repair

    $ 2.00


    Service Change/Upgrade/New

    100 Amp Service or less

    $ 5.00

    150 Amp Service

    $10.00

    200 Amp Service

    $15.00

    Over 200 Amp Service

    $20.00

  • Mechanical Permit Fees:

    Issue Fee $10.00

    Fee for Inspecting heating, ventilating ductwork, air conditioning and refrigeration systems shall be $10.00 for the first $1,000.00 (one thousand dollars) or fraction thereof, of valuation of the installation plus $2.00 for each $1,000.00 or fraction thereof.

    Fee for inspecting repairs, alterations and additions to an existing system shall be $5.00 plus $2.00 for each $1,000.00 or fraction thereof.

    Fee for inspecting Boilers (based upon Btu input)

    Description

    Fee

    33.000 Btu to 165,000

    $ 5.00

    165,001 Btu to 330,000

    $10.00

    330,001 Btu to 1,165,000

    $15.00

    Reinspection Fee

    $ 5.00

     


Turn your Plans into Profits in ATLANTA, TEXAS, USA
1-800-594-2135
Go to Homepage
Turn Plans into Profits
Locations-Maps-Details
Info in Standardized Charts
Metro Business Update
A Great Place to Live and Work
The Atlanta Texas Economic Development Corporation
Confidential, Professional Assistance


Powered by Earthnet